24/7 RESPONSE TIME

Contact Us

Or fill out our

Job completed for John O.

Completion date: October 22, 2021

Location: Ashburn, VA

Why did the customer contact us?

The customer needed a repair done for a crack in their bathroom.

Solutions provided:

Crack next to shower on rear wall in bathroom.
Grind out any material on wall to clean surface from top to bottom. Excavate small area in floor down to footer.
Install Carbon Fiber patch system down into excavated area. Apply epoxy to bond to wall and seal carbon fiber into floor. Cover excavated area with concrete.

Healthy Basement & Healthy Crawl Space Certificates

Our high standard of quality ensures a healthy basement with a Nationally Backed Warranty.